Madrid Campus MAD01
Madrid Campus
1
Data centers
40MW
Total critical power
8
Total acres
26K
Square Meters
Campus Overview
Acres
8
No of buildings
1
Critical IT Load
40MW
Size
25,810 sq m
No Of Data Halls
4
Utility Provider
Iberdrola
Substation
On site
M&E
N+1
Cooling
Closed loop air (40kw/rack), liquid (120kw/rack)
Connectivity
10 carriers on campus
Security
Comprehensive, layered protection
Sustainability
Powered by 100% renewable
Compliance
ISO 9001, ISO 27001 (projected)
Performance
AI-ready
Additional Features
Infrastructure galleries for data hall privacy
The Data Centers
Campus in Alcobendas to yield 40 MW critical.
MAD01-01
- NameMAD01-01 | C. de la Pedriza
- TypeHyperscale
- UseSingle or multi-tenant
- StatusDevelopment
- AvailabilityAvailable
- Capacity40MW
- Size25,810 sq m
Available